Planning for Offset Installation of a Capping Stack
Yann Hajeri, Saipem Technical Manager, and Mario Fazio, OSRL Subsea Manager, take a closer look at the use of OSRL Offset Installation Equipment to deploy a capping stack and equipment when vertical access over the subsea well is not possible.
Download the slides from the Seminar which was conducted.